What you get, and what we need

You get a cost, saving and payback range for every measure that suits each building, ranked across the estate. We need an address, a floor area and recent energy data. One building or a hundred: a portfolio comes in as a single list.

Four steps

The same four for one building or for a portfolio. You can stop after any of them.

  1. Add your buildings

    An address, the floor area and whether you own, lease or let each one. That is enough to begin. A portfolio comes in as a single list rather than one at a time.

    Illustrative building, not a real siteAdding one building, as a client sees it
    Add site
  2. Add your energy data

    Four ways, and you choose. Upload a bill, add us to the data portal you already have, sign an authority so we can ask your supplier, or let us estimate from floor area and say plainly that we have.

    Illustrative building, not a real siteA single site record, as a client sees it
    Site record

    Unit 4, Brookfield Industrial Estate

    Brookfield Way, Warrington, WA5 0AA

    Consent granted
    Floor area
    2,400 m2
    Property type
    Industrial
    EPC rating
    D
    Occupier type
    Owner occupier
    Consent state
    Consent granted
    electricity
    1900011234567HH
    Example Energy
    500
    214over provisioned
    gas
    8912345678
    Example Energy
    -
    -
  3. See what each one could save

    Cost, saving and payback for every measure at every building, as ranges rather than one flattering figure. Where a figure cannot be produced we say what is missing instead of estimating it.

    Illustrative building, not a real siteThe measure card, as a client sees it
    Solar PV
    Sized to the roof and the daytime load: 180 kWp
    Yield modelled for this location
    Savings
    Modelled saving
    £14,200 to £21,300 a year
    Indicative cost
    From £81,000, typically £104,400 to £111,600
    Payback
    4 years to 6.4 years
    Plan against the longer end: Up to 6.4 years.

    Modelled from the consumption figure you gave us, so an installer survey may land elsewhere in these ranges.

  4. Ask for a quote when you are ready

    Only when you want one, building by building and measure by measure. Every request runs through the same checks first, and where the building is not ready we tell you why rather than sending an installer to waste your afternoon.

    Illustrative building, not a real siteA quote request the checks are holding
    Battery storage
    Raised 3 Mar 2026 · no availability offered
    Held, something is needed from you
    • The measure applies to this building and has not been ruled out.
    • Owner occupied, so no landlord authority is needed.
    • Export headroom confirmed at the connection.
    • Half hourly consumption is not held for this building, and a battery cannot be sized without it.Add the missing detail on the site record, then raise the request again.

Four ways in

We cannot tell you what a building could save without knowing what it uses. You choose how we get it.

  1. 01

    Your data portal

    Most commercial clients already have one. Add us and you keep control.

  2. 02

    Upload a bill

    Or type in your annual spend and usage. Minutes.

  3. 03

    We ask your supplier

    With your written authority. Slower, but it works anywhere.

  4. 04

    An estimate

    Where none of those exist, clearly labelled as an estimate.

Ranges, not promises

Three rules decide how every figure on your report is framed.

Cost

Leads with the low end

Framed as from, because a survey decides the rest.
Saving

Shows the whole range

Never led with the best case.
Payback

Leads with the longer end

Four years that turns into seven costs us your trust.

Where we say nothing

Where something is missing we name it rather than filling it in. Some buildings produce very little, and that is a real answer.

Illustrative building, not a real siteThe same building, where data is missing
Solar PV
solar_pv
All 4 required details held
Export headroom confirmed at the connection
Owner occupied, so no landlord authority is needed
Battery storage
battery_storage
Missing: half hourly consumption
Export headroom confirmed at the connection
Owner occupied, so no landlord authority is needed
Heat pump
heat_pump
Missing: heat demand, plant age
Import capacity has not been checked, and a heat pump adds load
Owner occupied, so no landlord authority is needed

One assumption behind this measure is not sourced yet, so no figure is produced.

EV charging
ev_charger
All 3 required details held
Spare import capacity looks sufficient, but has not been confirmed
Owner occupied, so no landlord authority is needed

After you ask

Only if you want one. We check the building is genuinely suitable, then introduce as many installers as you asked for, up to three.

If it is not ready

We tell you why

In plain language, rather than sending you to an installer who wastes your afternoon.
If it is

As many as you asked for

One, two or three, whichever you chose. Where you ask for more than one they come a day apart, and each books a different time with you.
If you never ask

Nothing happens

Your details stay with us and nobody phones you.

Add your buildings