What you get, and what we need
You get a cost, saving and payback range for every measure that suits each building, ranked across the estate. We need an address, a floor area and recent energy data. One building or a hundred: a portfolio comes in as a single list.
Four steps
The same four for one building or for a portfolio. You can stop after any of them.
Add your buildings
An address, the floor area and whether you own, lease or let each one. That is enough to begin. A portfolio comes in as a single list rather than one at a time.
Illustrative building, not a real siteAdding one building, as a client sees it Add siteAdd your energy data
Four ways, and you choose. Upload a bill, add us to the data portal you already have, sign an authority so we can ask your supplier, or let us estimate from floor area and say plainly that we have.
Illustrative building, not a real siteA single site record, as a client sees it Site recordUnit 4, Brookfield Industrial Estate
Brookfield Way, Warrington, WA5 0AA
Consent grantedFloor area2,400 m2Property typeIndustrialEPC ratingDOccupier typeOwner occupierConsent stateConsent grantedelectricity1900011234567HHExample Energy500214over provisionedgas8912345678Example Energy--See what each one could save
Cost, saving and payback for every measure at every building, as ranges rather than one flattering figure. Where a figure cannot be produced we say what is missing instead of estimating it.
Illustrative building, not a real siteThe measure card, as a client sees it SavingsSolar PVSized to the roof and the daytime load: 180 kWpYield modelled for this locationModelled saving£14,200 to £21,300 a yearIndicative costFrom £81,000, typically £104,400 to £111,600Payback4 years to 6.4 yearsPlan against the longer end: Up to 6.4 years.Modelled from the consumption figure you gave us, so an installer survey may land elsewhere in these ranges.
Ask for a quote when you are ready
Only when you want one, building by building and measure by measure. Every request runs through the same checks first, and where the building is not ready we tell you why rather than sending an installer to waste your afternoon.
Illustrative building, not a real siteA quote request the checks are holding Held, something is needed from youBattery storageRaised 3 Mar 2026 · no availability offered- The measure applies to this building and has not been ruled out.
- Owner occupied, so no landlord authority is needed.
- Export headroom confirmed at the connection.
- Half hourly consumption is not held for this building, and a battery cannot be sized without it.Add the missing detail on the site record, then raise the request again.
Four ways in
We cannot tell you what a building could save without knowing what it uses. You choose how we get it.
- 01
Your data portal
Most commercial clients already have one. Add us and you keep control.
- 02
Upload a bill
Or type in your annual spend and usage. Minutes.
- 03
We ask your supplier
With your written authority. Slower, but it works anywhere.
- 04
An estimate
Where none of those exist, clearly labelled as an estimate.
Ranges, not promises
Three rules decide how every figure on your report is framed.
Leads with the low end
Shows the whole range
Leads with the longer end
Where we say nothing
Where something is missing we name it rather than filling it in. Some buildings produce very little, and that is a real answer.
One assumption behind this measure is not sourced yet, so no figure is produced.
After you ask
Only if you want one. We check the building is genuinely suitable, then introduce as many installers as you asked for, up to three.
We tell you why
As many as you asked for
Nothing happens
The measures
What drives each one, and what a building needs to have before it is worth modelling.
- 01Solar panelsSavingsRoof rights, export headroomSourced
- 02Battery storageSavingsExport headroom, half hourly dataSourced
- 03Heat pumpsPlant conditionSpare import capacity, plant ageProvisional
- 04EV chargingSavingsSpare import capacity, parkingSourced
- 05Voltage optimisationSavingsMeasured peak, supply voltageSourced
- 06LED lightingSavingsFloor area, operating hoursSourced
- 07InsulationRatingFabric type, current ratingProvisional
- 08BoilersPlant conditionPlant age and conditionProvisional
We also read your bills for capacity, band and levy errors. That needs no spending at all.
Add your buildings
One address and a recent bill is enough to begin, and a portfolio can come in as a single list. It costs nothing and nobody contacts you unless you ask.